Info about Shuttle Flight STS- 29

NASA
SPACE SHUTTLE MISSION STS-29
PRESS KIT

MARCH 1989

CONTACTS

Sarah Keegan/Barbara Selby
Office of Space Flight
Headquarters, Washington, D.C.
(Phone: 202/453-2352)

Geoffrey Vincent
Office of Space Operations
Headquarters, Washington, D.C.
(Phone: 202/453-8400)

Lisa Malone
Kennedy Space Center, Fla.
(Phone: 407/867-2468)

Kyle Herring
Johnson Space Center, Houston
(Phone: 713/483-5111)

Jerry Berg
Marshall Space Flight Center, Huntsville, Ala.
(Phone: 205/544-0034)

Nancy Lovato
Ames-Dryden Flight Research Facility, Edwards, Calif.
(Phone: 805/258-8381)

Jim Elliott
Goddard Space Flight Center, Greenbelt, Md.
(Phone: 301/286-6256)

CONTENTS

GENERAL RELEASE............................................1

GENERAL INFORMATION........................................3

QUICK LOOK FACTS...........................................4

STS-29 MISSION OBJECTIVES..................................4

LAUNCH PREPARATION, COUNTDOWN AND LIFTOFF..................5

MAJOR COUNTDOWN MILESTONES.................................7

TRAJECTORY SEQUENCE OF EVENTS..............................9

ABORT MODES...............................................10

SUMMARY OF MAJOR ACTIVITIES...............................10

LANDING AND POST-LANDING OPERATIONS.......................11

TRACKING AND DATA RELAY SATELLITE.........................12

INERTIAL UPPER STAGE......................................14

SECONDARY PAYLOADS:.......................................15

Space Station Heat Pipe Advanced Radiator Element......15
Chromex................................................16
Protein Crystal Growth Experiment......................16
Student Experiments....................................18

IMAX......................................................19

AMOS......................................................20

OASIS INSTRUMENTATION.....................................20

STS-29 CARGO CONFIGURATION................................20b

PAYLOAD AND VEHICLE WEIGHT SUMMARY........................21

SPACEFLIGHT TRACKING AND DATA NETWORK.....................22

MCC REAL TIME DATA SYSTEM.................................23

CREW BIOGRAPHIES..........................................25

SPACE SHUTTLE PROGRAM MANAGEMENT..........................28

GENERAL RELEASE

RELEASE: 89- IMMEDIATE

THIRD TRACKING AND DATA RELAY SATELLITE TO BE DEPLOYED BY STS-29

Deployment of the third Tracking and Data Relay Satellite
(TDRS-D) will highlight the 28th Space Shuttle mission (STS-
29). The assessed launch date is no earlier than March 10, 1989.

Three TDRS, operating from geosynchronous orbit, are
required to complete the constellation known as the Tracking and
Data Relay Satellite System (TDRSS). TDRSS will increase
communications, between Earth-orbiting spacecraft and a ground-
based tracking station, from 15 to 85 percent per orbit and
facilitate a much higher rate of data flow.

TDRS-C was successfully deployed on STS-26 in September 1988
and is located in geosynchronous orbit at 171 degrees W.
longitude, south of Hawaii. TDRS-D will be located at 41 degrees
W. longitude, east of Brazil. TDRS-A, deployed on STS-6 in April
1983, then will be moved to a parking orbit and used only if a
failure occurs with one of the remaining two satellites. TDRS-B
was lost in the 51-L Challenger accident.

Commander of the five-man crew is Michael L. Coats, captain,
USN. Coats was pilot of STS 41-D, the maiden flight of orbiter
Discovery. John E. Blaha, colonel, USAF, is pilot of the
mission. STS-29 will be his first space flight.

Rounding out the crew are three mission specialists: James
F. Buchli, colonel, USMC; Robert C. Springer, colonel, USMC; and
James P. Bagian, M.D. Buchli is making his third Shuttle flight
having flown as a mission specialist on STS 51-C, the first
Department of Defense Shuttle mission, and STS 61-A, the West
German Spacelab flight. Springer and Bagian are making their
first Shuttle flights.

Discovery, making its eighth flight, is assessed to be ready
for launch no earlier than 8:11 a.m. EST, March 10, from the
Kennedy Space Center, Fla., launch pad 39-B, into a 160 nautical
mile, 28.45 degree orbit. Nominal mission duration is 5 days, 1
hour, 7 minutes. Deorbit is planned on orbit 80, with landing
scheduled for 9:48 a.m. EST, March 15, at Edwards Air Force Base,
Calif. In the event of a slip in the launch, liftoff would occur
1 minute earlier for each day the launch is delayed.

TDRS-D will be deployed 6 hours, 13 minutes into the mission
on flight day 1. Two additional deployment opportunities are
available on that day and one the following day.

An Air Force-developed inertial upper stage (IUS) will boost
the TDRS to geosynchronous orbit (22,300 miles above Earth) after
deployment from the Shuttle. The IUS is mated to the TDRS-D and
the combination spacecraft and upper stage will be spring ejected
from the payload bay of the orbiter.

Following deployment, Discovery will maneuver to a safe
position behind and above the TDRS-D/IUS before the first stage
of the two-stage IUS motor ignites about an hour after
deployment. The three-axis, stabilized upper stage will maneuver
TDRS to the desired attitude where it will be configured for
operation by the NASA White Sands Ground Terminal, N.M.

CONTEL, Atlanta, Ga., owns and operates the TDRSS for
NASA. TRW's Defense and Space Systems Group, Redondo Beach,
Calif., builds the satellites.

The Orbiter Experiments Program Autonomous Supporting
Instrumentation System (OASIS) will be flown again on STS-29 to
record environmental data in the orbiter payload bay during
flight phases. OASIS will measure TDRS vibration, strain,
acoustics and temperature during launch ascent using transducers
affixed directly to the payload.

OASIS flight hardware consists of signal conditioning,
multiplexing and recording equipment mounted on a Shuttle
adaptive payload carrier behind the TDRS. Command and status
interface is achieved through the standard mixed cargo harness
and the general purpose computers.

In addition to TDRS-D and OASIS, Discovery will carry the
Space Station Heat Pipe Advanced Radiator Element (SHARE) in the
payload bay. Several secondary payloads will be carried in the
middeck of Discovery, including the IMAX camera, two student
experiments, a protein crystal growth experiment and a chromosome
and plant cell division experiment.

After landing, Discovery will be towed to the NASA Ames-
Dryden Flight Research Facility, hoisted atop the Shuttle Carrier
Aircraft and ferried back to the Kennedy Space Center to begin
processing for its next flight scheduled for August.

(END OF GENERAL RELEASE, BACKGROUND INFORMATION FOLLOWS)

GENERAL INFORMATION

NASA Select Television Transmission

The schedule for television transmission from the orbiter
and for the change-of-shift briefings from Johnson Space Center,
Houston, will be available during the mission at Kennedy Space
Center, Fla.; Marshall Space Flight Center, Huntsville, Ala.;
Johnson Space Center; and NASA Headquarters, Washington, D.C.
The television schedule will be updated daily to reflect changes
dictated by mission operations. NASA Select television is
available on RCA Satcom F-2R, Transponder 13, located at 72
degrees west longitude.

Special Note To Broadcasters

Beginning in February and continuing throughout the mission,
approximately 7 minutes of audio interview material with the crew
of STS-29 will be available to broadcasters by calling 202/269-
6572.

Status Reports

Status reports on countdown and mission progress, on-orbit
activities and landing operations will be produced by the
appropriate NASA newscenter.

Briefings

An STS-29 mission press briefing schedule will be issued
prior to launch. During the mission, flight control personnel
will be on 8-hour shifts. Change-of-shift briefings by the off-
going flight director will occur at approximately 8-hour
intervals.

STS-29 QUICK LOOK

Assessed Launch Date: March 10, 1989

Launch Window: 8:11 a.m. - 10:41 a.m. EST

Launch Site: KSC, Pad 39B

Orbiter: Discovery (OV-103)

Altitude: 160 nm

Inclination: 28.45 degrees

Duration: 5 days, 1 hour, 7 minutes

Landing Date/Time: March 15, 1989, 9:48 a.m. EST

Primary Landing Site: Edwards AFB, Calif., Runway 17

Alternate Landing Sites:

Return to Launch Site - Kennedy Space Center, Runway 33
Transoceanic Abort Landing - Ben Guerir, Morocco
Abort Once Around - Edwards AFB, Calif.

Crew: Michael L. Coats, Commander
John E. Blaha, Pilot
James F. Buchli, Mission Specialist
Robert C. Springer, Mission Specialist
James P. Bagian, Mission Specialist

Primary Payload: Tracking & Data Relay Satellite (TDRS-D)

Secondary Payloads:

Space Station Heat Pipe Advanced Radiator Element (SHARE)
Chromosomes & Plant Cell Division (CHROMEX)
Protein Crystal Growth (PCG)
Shuttle Student Involvement Program (SSIP) - 2 experiments
Orbiter Experiments - Autonomous Supporting Instrumentation
System (OASIS)
IMAX Camera

STS-29 MISSION OBJECTIVES

The primary objective of this flight is to successfully
deploy the Tracking and Data Relay Satellite-D/Inertial Upper
Stage (TDRS-D/IUS). TDRS-D is scheduled to be deployed on flight
day 1, orbit 6. Several backup deployment opportunities exist
during the flight. Secondary objectives are to perform all
operations necessary to support the requirements of the middeck
and payload bay experiments.

LAUNCH PREPARATIONS, COUNTDOWN AND LIFTOFF

After the successful STS-26 mission, Discovery was returned
to KSC from Dryden Flight Research Facility on Oct. 8. The next
day, Discovery was towed to the processing hangar for post-flight
deconfiguration and inspections.

As planned, the three main engines were removed in October
and taken to the main engine shop in the Vehicle Assembly
Building for the replacement of several components. During post-
flight inspections, technicians discovered a small leak in the
cooling system of the main combustion chamber of the number one
main engine. That engine was shipped back to the vendor where
repairs could be made and a new engine was shipped from the
Stennis Space Center, Miss.

Discovery's three main engines were installed before the end
of last year. Engine 2031 is installed in the number one
position, engine 2022 is in the number two position and engine
2028 is in the number three position.

The right hand orbital maneuvering system pod was removed in
late October and transferred to the Hypergolic Maintenance
Facility where a small internal leak was repaired. One of the
orbiter's cooling systems, called the flash evaporator system,
was replaced after some in-flight problems. Post-flight
inspections revealed that the system was clogged with foreign
material.

Once the turn-around activities were completed, Discovery
was transferred from the Orbiter Processing Facility to the
Vehicle Assembly Building on Jan. 19.

Solid rocket motor (SRM) segments began arriving at KSC in
September, and the first segment - the left aft booster - was
stacked on Mobile Launcher 2 in VAB high bay 1 on Oct. 21.
Booster stacking operations were completed by early December and
the external tank was mated to the two boosters on Dec. 16.

The OASIS payload was installed in Discovery's payload bay
for flight on Dec. 9. Flight crew members came to KSC to perform
the Crew Equipment Interface Test on Dec. 11 to become familiar
with Discovery's crew compartment and equipment associated with
the mission.

The Tracking and Data Relay Satellite (TDRS-D) arrived at
the Vertical Processing Facility (VPF) on Nov. 30, and its
Inertial Upper Stage (IUS) arrived Dec. 27. The TDRS/IUS were
joined together on Dec. 29 and all integrated testing was
performed the first week of January. As part of those tests,
Astronauts James Bagian and Robert Springer participated in the
mission sequence test to verify payload functions that occur
post-launch and during deployment.

A variety of middeck payloads and experiments, some of which
are time critical and installed during the launch countdown, are
processed through various KSC facilities.

Discovery was moved from the OPF to the VAB on Jan. 23,
where it was mated to the external tank and SRBs. A Shuttle
Interface Test was conducted to check the mechanical and
electrical connections between the various elements of the
Shuttle vehicle and onboard flight systems.

The assembled Space Shuttle vehicle was rolled out of the
VAB aboard its mobile launcher platform for the 4.2 mile trip to
Launch Pad 39-B on Feb. 3. TDRS-D and its IUS upper stage were
transferred from the VPF to Launch Pad 39-B on Jan. 17. The
payload was installed into Discovery's payload bay on Feb. 6.

A countdown demonstration test, a dress rehearsal for the
STS-29 flight crew and KSC launch team and a practice countdown
for the launch, was completed on Feb. 7.

Launch preparations scheduled the last 2 weeks prior to
launch countdown include change-out of the orbiter SSME liquid
oxygen pumps; final vehicle ordnance activities, such as power-
on, stray-voltage checks and resistance checks of firing
circuits; loading the fuel cell storage tanks; pressurizing the
hypergolic propellant tanks aboard the vehicle; final payload
closeouts; and a final functional check of the range safety and
SRB ignition, safe and arm devices.

The launch countdown is scheduled to pick up at the T-
minus-43-hour mark, leading up to the first Shuttle liftoff for
the year. The STS-29 launch will be conducted by a joint
NASA/industry team from Firing Room 1 in the Launch Control
Center.

MAJOR COUNTDOWN MILESTONES

COUNT EVENT

T-43 Hours Power up the Space Shuttle vehicle.

T-34 Hours Begin orbiter and ground support
equipment closeouts for launch.

T-30 Hours Activate orbiter's navigation aids.

T-27 Hours (holding) Enter first built-in hold for 8 hrs.

T-27 Hours (counting) Begin preparations for loading fuel
cell storage tanks with liquid
oxygen and liquid hydrogen

T-25 Hours Load fuel cell liquid oxygen

T-22 Hours, 30 minutes Load fuel cell liquid hydrogen.

T-22 Hours Perform interface check between
Mission Control and Merritt Island
Launch Area (MILA) tracking station.

T-20 Hours Activate and warm up inertial
measurement units (IMUs).

T-19 Hours Enter the 8-hour, built-in hold.
Activate orbiter comm system.

T-11 Hours (holding) Start 18-hour, 10-minute, built-in
hold. Check ascent switch list on
orbiter flight and middecks.

T-11 Hours (counting) Retract Rotating Service Structure.

T-9 Hours Activate orbiter's fuel cells.

T-8 Hours Configure Mission Control
communications for launch. Start
clearing blast danger area.

T-6 Hours, 30 minutes Perform Eastern Test Range open loop
command test.

T-6 Hours Enter 1-hour built-in hold.

T-6 Hours (counting) Start external tank chilldown and
propellant loading.

T-5 Hours Start IMU pre-flight calibration.

T-4 Hours Perform MILA antenna alignment.

T-3 Hours Begin 2-hour built-in hold. Loading
external tank completed and tank in
stable replenishment mode. Ice team
to pad for inspections. Closeout
crew to white room to begin preping
orbiter's cabin for flight crew
entry. Wake flight crew (launch
minus 4 hours, 55 minutes).

T-3 Hours (counting) Resume countdown.

T-2 Hours, 55 minutes Flight crew departs O&C Building for
39-B (Launch minus 3 hours, 15
minutes).

T-2 Hours, 30 minutes Crew enters orbiter vehicle (Launch
minus 2 Hours, 50 minutes).

T-60 minutes Start pre-flight alignment of IMUs.

T-20 minutes (holding) 10-minute, built-in hold begins.

T-20 minutes (counting) Configure orbiter computers for
launch.

T-10 minutes White room closeout crew cleared
through area roadblocks.

T-9 minutes (holding) 10-minute, built-in hold begins.
Perform status check and receive
Mission Management Team "go."

T-9 minutes (counting) Start ground launch sequencer.

T-7 minutes, 30 seconds Retract orbiter access arm.

T-5 minutes Start auxiliary power units. Arm
range safety, SRB ignition systems.

T-3 minutes, 30 seconds Orbiter goes on internal power.

T-2 minutes, 55 seconds Pressurize liquid oxygen tank and
retract gaseous oxygen vent hood.

T-1 minute, 57 seconds Pressurize liquid hydrogen tank.

T-31 seconds "Go" from ground computer for
orbiter computers to start the
automatic launch sequence.

T-28 seconds Start SRB hydraulic power units.

T-21 seconds Start SRB gimbal profile test.

T-6.6 seconds Main engine start.

T-3 seconds Main engines at 90 percent thrust.

T-0 SRB ignition, holddown-post release
and liftoff.

T+7 seconds Shuttle clears launch tower and
control switches to Houston.

STS-29 TRAJECTORY SEQUENCE OF EVENTS

_________________________________________________________________
RELATIVE
EVENT MET VELOCITY MACH ALTITUDE
(d:h:m:s) (fps) (ft)
_________________________________________________________________

Launch 0:00:00:00

Begin Roll Maneuver 0:00:00:09 157 .14 593

End Roll Maneuver 0:00:00:17 356 .32 2,749

SSME Throttle Down to 65% 0:00:00:28 652 .58 7,588

Max. Dyn. Pressure (Max Q) 0:00:00:52 1,173 1.08 26,089

SSME Throttle Up to 104% 0:00:00:57 1,274 1.20 30,768

SRB Staging 0:00:02:06 4,169 3.77 155,892

Negative Return 0:00:03:58 6,862 7.09 327,981

Main Engine Cutoff (MECO)* 0:00:08:32 24,507 22.70 363,209

Zero Thrust 0:00:08:39

OMS 2 Burn** 0:00:39:53

TDRS/IUS Deploy (orbit 5) 0:06:13:00

Deorbit Burn (orbit 80) 5:00:06:00

Landing (orbit 81) 5:01:07:00

* Apogee, Perigee at MECO: 156 x 35
** Direct insertion ascent: No OMS 1 required
Apogee, Perigee post-OMS 2: 160 x 160
Apogee, Perigee post-deploy: 177 x 161

SPACE SHUTTLE ABORT MODES

Space Shuttle launch abort philosophy aims toward safe and
intact recovery of flight crew, orbiter and payload. Modes are:

* Abort-To-Orbit (ATO) -- Partial loss of main engine thrust
late enough to permit reaching a minimal 105-nm orbit with
orbital maneuvering system engines.

* Abort-Once-Around (AOA) -- Earlier main engine shutdown
with the capability to allow one orbit around before landing at
Edwards AFB, Calif.; White Sands Space Harbor (Northrup Strip),
N.M.; or the Shuttle Landing Facility (SLF) at KSC, Fla.

* Trans-Atlantic Abort Landing (TAL) -- Loss of two main
engines midway through powered flight would force a landing at
Ben Guerir, Morocco; Moron, Spain; or Banjul, The Gambia.

* Return-To-Launch-Site (RTLS) -- Early shutdown of one or
more engines and without enough energy to reach Ben Guerir, would
result in a pitch around and thrust back toward KSC until within
gliding distance of the SLF.

STS-29 contingency landing sites are Edwards AFB, White
Sands, Kennedy Space Center, Ben Guerir, Moron and Banjul.

SUMMARY OF MAJOR FLIGHT ACTIVITIES

DAY ONE

Ascent, Post-insertion checkout
Pre-deploy checkout, TDRS-D/IUS deploy; PCG activation, SSIP

DAY TWO

TDRS-D/IUS backup deploy opportunity
AMOS, CHROMEX, IMAX, PCG, SSIP, SHARE test 1

DAY THREE

AMOS, CHROMEX, IMAX, PCG, SSIP, SHARE test 2

DAY FOUR

AMOS, CHROMEX, SSIP

DAY FIVE

Flight control systems checkout, Cabin stowage, Landing preps
CHROMEX, SSIP; PCG deactivation, SHARE deprime

DAY SIX

SHARE cold soak test, SSIP
Deorbit preparation, Deorbit burn, Landing at EAFB

LANDING AND POST-LANDING ACTIVITIES

KSC is responsible for ground operations of the orbiter once
it has rolled to a stop on the runway at Edwards AFB. Operations
include preparing the Shuttle for the return trip to Kennedy.

After landing, the flight crew aboard Discovery begins
"safing" vehicle systems. Immediately after wheelstop, specially
garbed technicians will first determine that any residual
hazardous vapors are below significant levels for other safing
operations to proceed.

A mobile white room is moved into place around the crew
hatch once it is verified that there are no concentrations of
toxic gases around the forward part of the vehicle. The crew is
expected to leave Discovery about 45 to 50 minutes after
landing. As the crew exits, technicians enter the orbiter to
complete the vehicle safing activity.

Once the initial aft safety assessment is made, access
vehicles are positioned around the rear of the orbiter so that
lines from the ground purge and cooling vehicles can be connected
to the umbilical panels on the aft end of Discovery.

Freon line connections are completed and coolant begins
circulating through the umbilicals to aid in heat rejection and
protect the orbiter's electronic equipment. Other lines provide
cooled, humidified air to the payload bay and other cavities to
remove any residual fumes and provide a safe environment inside
Discovery.

A tractor will be connected to Discovery and the vehicle
will be towed off the runway at Edwards and positioned inside the
Mate/Demate Device at the nearby Ames-Dryden Flight Research
Facility. After the Shuttle has been jacked and leveled,
residual fuel cell cryogenics are drained and unused pyrotechnic
devices are disconnected.

The aerodynamic tail cone is installed over the three main
engines, and the orbiter is bolted on top of the 747 Shuttle
Carrier Aircraft for the ferry flight back to Florida. A
refueling stop is necessary to complete the journey.

Once back at Kennedy, Discovery will be pulled inside the
hangar-like facility for post-flight inspections and in-flight
anomaly troubleshooting. These operations are conducted in
parallel with the start of routine systems reverification to
prepare Discovery for its next mission.

TRACKING AND DATA RELAY SATELLITE SYSTEM

The Tracking and Data Relay Satellite, TDRS-D, is the fourth
TDRS communications spacecraft to be launched aboard the Space
Shuttle and completes the constellation of on-orbit satellites
for NASA's advanced space communications system. TDRS-1 was
launched during Challenger's maiden flight in April 1983. The
second was lost during the Challenger accident in January 1986.
TDRS-3 was launched successfully on Sept. 29, 1988, during the
landmark mission of Discovery, which returned the Space Shuttle
to flight.

TDRS-1 is in geosynchronous orbit over the Atlantic Ocean,
just east of Brazil (41 degrees west longitude at the equator).
When it was launched, it failed to reach its desired orbit
because of a failure in the upper-stage booster rocket. A NASA-
industry team subsequently conducted a series of delicate
spacecraft maneuvers, using on-board thrusters, to place TDRS-1
into the desired 22,300-mile-altitude orbit.

TDRS-3 is in geosynchronous orbit over the Pacific Ocean,
south of Hawaii (171 degree west longitude, also over the
equator). It has performed flawlessly in tests and helped
support the STS-27 mission in December 1988.

After its launch, TDRS-D will be designated TDRS-4.
Following its arrival at geosynchronous orbit and a series of
tests, it will replace the partially degraded TDRS-1 over the
Atlantic. TDRS-1 then will be moved to 79 degrees west
longitude, above the Equator, where it will be used as an on-
orbit spare.

The two operational TDRS -- those located at 41 and 171
degrees west longitude -- will support up to 23 user spacecraft
simultaneously and provide two basic types of service: a
multiple-access service that simultaneously relays data from as
many as 19 low-data-rate user spacecraft; and a single-access
service that provides two high-data-rate communications relays
from each satellite.

TDRS-4 will be deployed from the orbiter about 6 hours after
launch. The solid-propellant Boeing/U.S. Air Force Inertial
Upper Stage (IUS) will transfer the satellite to geosynchronous
orbit. IUS separation will occur about 13 hours after launch.

The concept of using advanced communications satellites was
developed in the early 1970s, following studies showing that a
system of communications satellites operated from a single ground
terminal could support Space Shuttle and other low-Earth-orbit
space missions more effectively than a worldwide network of
ground stations. The current ground station network can only
provide support for a small fraction -- typically 15 to 20
percent -- of the orbits of user spacecraft. The modern, space-
based TDRS network covers at least 85 percent of the orbits.

The new system also will facilitate a much higher
information flow rate between the spacecraft and the ground.
This will be particularly important as NASA resumes regular
Shuttle flights and launches satellites with high data rates.

NASA's Space Tracking and Data Network ground stations,
managed by the Goddard Space Flight Center, Greenbelt, Md., will
be reduced significantly in number. Three of the network's
present ground stations -- Madrid, Spain; Canberra, Australia;
and Goldstone, Calif. -- already have been transferred to the
Deep Space Network, managed by the Jet Propulsion Laboratory,
Pasadena, Calif. The remaining ground stations, except those
needed for launch operations,!will be closed or transferred to
other agencies.

The White Sands Ground Terminal (WSGT) is situated on a NASA
test site located between Las Cruces and White Sands, N.M. A
colocated NASA facility provides the interface between the WSGT
and the NASA space network facilities at Goddard Space Flight
Center. A technologically advanced second ground terminal is
being built near White Sands to provide back-up and additional
capability.

The tracking and data relay satellites are the largest
privately owned telecommunications spacecraft ever built, and the
first to handle satellite communications through the S and Ku
frequency bands. Each weighs about 2 tons, spans almost 60 feet
across its solar panels and contains seven antennas. Each of the
two gold-plated, single-access antennas measures 16 feet in
diameter and, when fully deployed, spans more than 42 feet from
tip to tip.

The combination of satellites and ground facilities is
referred to as the Tracking and Data Relay Satellite System or
TDRSS. NASA leases the TDRSS complement of services from CONTEL,
Atlanta, Ga., which is the owner, operator and prime
contractor. CONTEL's two primary subcontractors are TRW's Space
and Technology Group, Redondo Beach, Calif., and the Harris
Corporation's Government Communications Systems Division,
Melbourne, Fla. TRW designed and built the spacecraft and
software for ground terminal operation, and integrated and tested
the system. Harris designed and built the ground terminal
equipment.

The Space Shuttle, LANDSAT Earth Resources satellites, Solar
Mesosphere Explorer, Earth Radiation Budget Satellite, Solar
Maximum Mission satellite and Spacelab have been primary users of
TDRSS. They will be joined in the future by the Hubble Space
Telescope, Gamma Ray Observatory, Upper Atmosphere Research
Satellite and others.

INERTIAL UPPER STAGE

The Interial Upper Stage (IUS) will be used to place NASA's
TDRS-D into geosynchronous orbit during the STS-29 Space Shuttle
mission.

The STS-29 crew will deploy the combined IUS/TDRS-D payload
approximately 6 hours, 13 minutes after liftoff, in a low-Earth
orbit of 160 nautical miles. Upper stage airborne support
equipment, located in the orbiter payload bay, positions the
combined IUS/TDRS-D into its proper deployment attitude -- an
angle of 52 degrees -- and ejects it into low-Earth orbit.
Deployment from the orbiter will be by a spring-ejection system.

Following deployment, the orbiter will move away from the
IUS/TDRS-D to a safe distance. The IUS first stage will fire
about 1 hour after deployment. After the first stage burn of 146
seconds, the solid fuel motor will shut down. After coasting for
about 5 hours, 13 minutes, the first stage will separate and the
second stage motor will ignite at 6 hours, 12 minutes after
deployment to place the spacecraft in its desired orbit.
Following a 108-second burn, the second stage will shut down as
the IUS/TDRS-D reaches the predetermined, geosynchronous orbital
position.

Thirteen hours, 9 minutes after liftoff, the second stage
will separate from TDRS-D and perform an anti-collision maneuver
with its onboard reaction control system.

The IUS has a number of features which distinguish it from
previous upper stages. It has the first completely redundant
avionics system developed for an unmanned space vehicle. It can
correct in-flight features within milliseconds.

Other advanced features include a carbon composite nozzle
throat that makes possible the high-temperature, long-duration
firing of the IUS motors and a redundant computer system.

The IUS is 17 ft. long, 9 ft. in diameter and weighs more
than 32,500 lb., including 27,400 lb. of solid fuel propellant.
The IUS consists of an aft skirt, an aft stage containing 21,400
lb. of solid propellant which generates approximately 42,000 lb.
of thrust, an interstage, a forward stage containing 6,000 lb. of
propellant generating 18,000 lb. of thrust, and an equipment
support section. The equipment support section contains the
avionics which provide guidance, navigation, telemetry, command
and data management, reaction control and electrical power.

The IUS is built by Boeing Aerospace, Seattle, under
contract to the U.S. Air Force Systems Command. Marshall Space
Flight Center, Huntsville, Ala., is NASA's lead center for IUS
development and program management of NASA-configured IUSs
procured from the Air Force.

SECONDARY PAYLOADS

SPACE STATION HEAT PIPE ADVANCED RADIATOR ELEMENT (SHARE)

SHARE flight experiment will be mounted on the starboard
sill of the Orbiter's payload bay with a small instrumentation
package mounted in the forward payload bay. The goal of the
experiment is to test a first-of-its-kind method for a potential
cooling system of Space Station Freedom.

The heat pipe method uses no moving parts and works through
the convection currents of ammonia. Three electric heaters will
warm one end of the 51-foot long SHARE. The heaters turn liquid
ammonia into vapor which transports the heat through the length
of the pipe, where a foot-wide aluminum fin radiates it into
space. The fin is cooled by the space environment, and the
ammonia is inturn condensed and recirculated.

Two small pipes run through the center of the radiator down
its length, branching out like the tines of a fork at the end
which receives heat, called the evaporator. The top pipe holds
the vaporized ammonia; the bottom holds liquid ammonia. In the
evaporator portion, a fine wire mesh wick, which works along the
same principal as the wick of an oil lamp, pulls the liquid
ammonia from one pipe to the other, where it vaporizes. Small
grooves allow the condensed ammonia to drop back to the bottom
pipe.

The radiator for SHARE weighs about 135 pounds, but with its
support pedestals, support beam, heaters and instrumentation
package, the total experiment weighs about 650 pounds.

Crew members will switch the heaters on using controls
located on the aft flight deck. Each of the experiment's two
500-watt heaters and single 1,000-watt heater is controlled
individually and will be switched on in turn, applying heat that
will increase steadily in 500-watt increments up to a maximum of
2,000 watts.

The experiment will be activated for two complete orbits in
two different attitudes, the first with the payload bay toward
Earth and the second with the orbiter's tail toward the Sun. The
heaters will go through a complete 500-watt to 2,000-watt cycle
for each activation. This will simulate the heat that needs to
be dissipated from the Space Station, and the two attitudes will
provide data on the heat pipe's operation in different thermal
environments.

Other information also may be obtained during STS-29 if time
permits, including a test of the heat pipe's minimum operating
temperature, thought to be about minus 20 degrees Fahrenheit, and
a test of its ability to recover from acceleration.

The crew may fire the orbiter's aft reaction control system
thrusters for about 6 seconds, an action that would push the
fluid in SHARE to one end of the pipe. The heaters then may be
turned on again to see if the heat pipe will automatically
reprime itself and begin operating.

CHROMEX

This experiment will determine whether the roots of a plant
in microgravity will develop similarly to those on Earth. Root-
free shoots of the plants daylily and haplopappus will be used.
The experiment will determine whether:

o The normal rate, frequency and patterning of cell division
in the root tops can be sustained in space.

o The chromosomes and genetic makeup is maintained during
and after exposure to space flight conditions.

o Aseptically grown tissue cultured materials will grow and
differentiate normally in space

The criteria for comparison include: number of roots
formed, length, weight and quality based on subjective appraisal
as well as quantitative morphological and histological
examination.

Root tip cells will be analyzed for their karyotype, the
configuration of chromosomes, upon return. Haplopappus
dicatolydon is a unique flowering plant with four chromosomes in
its diploid cells (2n=4). Daylily monocatolydon also has
specific features of its karyotype 2n=22.

Daylily and haplopappus gracilis will be flown in the plant
growth unit (PGU), located in the orbiter middeck. The PGU can
hold up to six plant growth chambers (PGC). One PGC will be
replaced with the atmospheric exchange system that will filter
cabin air before pumping through the remaining PGCs. The
experimental plan is to collect and treat roots post flight,
before the first cell division cycle is completed.

Previous observations of some plants grown in space have
indicated a substantially lowered level of cell division in
primary root tips and a range of chromosomal abnormalities, such
as breakage and fusion.

PROTEIN CRYSTAL GROWTH EXPERIMENT

STS-29 protein crystal growth experiments are expected to
help advance a technology attracting intense interest from major
pharmaceutical houses, the biotech industry and agrichemical
companies.

A team of industry, university and government research
investigators will explore the potential advantages of using
protein crystals grown in space to determine the complex, three-
dimensional structure of specific protein molecules.

Knowing the precise structure of these complex molecules
provides the key to understanding their biological function and
could lead to methods of altering or controlling the function in
ways that may result in new drugs.

It is through sophisticated analysis of a protein in
crystalized form that scientists are able to construct a model of
the molecular structure. The problem is that protein crystals
grown on Earth are often small and flawed.

Protein crystal growth experiments flown on four previous
Space Shuttle missions have already shown promising evidence that
superior crystals can be obtained in the microgravity environment
of space flight.

To further develop the scientific and technological
foundation for protein crystal growth in space, NASA's Office of
Commercial Programs and the Microgravity Science and Applications
Division are co-sponsoring the STS-29 experiments being managed
through the Marshall Space Flight Center.

During the flight, 60 different crystal growth experiments
will be conducted simultaneously using 19 different proteins.
The experiment apparatus, first flown aboard Discovery on STS-26,
fits into one of the Shuttle orbiter's middeck lockers.

Shortly after achieving orbit, a mission specialist
astronaut will initiate the crystal growing process which will
continue for several days. The experiment apparatus differs from
previous protein crystal payloads in that it provides temperature
control and automation of some processes.

After Discovery's landing, the experiment hardware and
protein crystals will be turned over to the investigating team
for analysis.

Lead investigator for the research team is Dr. Charles E.
Bugg of the University of Alabama-Birmingham (UAB). Dr. Bugg is
director of the Center for Macromolecular Crystallography, a
NASA-sponsored Center for the Commercial Development of Space
located at UAB.

Flying crystal growth experiments through their affiliation
with the UAB Center for Commercial Development of Space are
Dupont; Eli Lilly & Company; Kodak; Merck Institute for
Therapuetic Research; Schering-Plough Corp.; Smith, Kline and
French; Upjohn; and Biocryst Limited.

STUDENT EXPERIMENTS

Chicken Embryo Development in Space, SE83-9

This experiment, proposed by John C. Vellinger, formerly of
Jefferson High School, Lafayette, Ind., will determine the
effects of spaceflight on the development of fertilized chicken
embryos. Vellinger is now a senior at Purdue University studying
mechanical engineering.

The experiment is to fly 32 chicken eggs -- 16 fertilized
two days prior to launch and the other 16 fertilized 9 days prior
to launch -- to see if any changes in the developing embryo can
be attributed to weightlessness.

All 32 eggs will be placed in an incubator box, designed by
Vellinger and flown aboard Discovery, while an identical group of
32 eggs will remain on Earth as a control group. Throughout the
mission, Vellinger will attend to the earthbound eggs much as a
mother hen would, turning them five times a day to counter the
effects of Earth's gravity on the yolk.

Upon return to Earth, the spaceflight group will be returned
to Vellinger, who will open and examine 16 of them. At the same
time he will open and examine half the control group eggs. The
examinations are intended to identify any statistically
significant differences in cartilage, bone and digit structures,
muscle system, nervous system, facial structure and internal
organs. The other half of the eggs (16 spaceflight and 16
control) will be hatched at 21 days and their weight, growth rate
and reproductive rate will be studied.

Vellinger's goal is to determine whether a chicken embryo
can develop normally in a weightless environment. The scientific
team supporting Vellinger includes: Dr. Cesar Fermin, Tulane
University; Dr. Patricia Hester, Purdue University; Dr. Michale
Holick, Boston University; Dr. Ronald Hullinger, Purdue
University; and Dr. Russell Kerschmann, University of
Massachusetts.

Stanley W. Poelstra of Jefferson High School is Vellinger's
student advisor. Dr. Lisbeth Kraft, NASA Ames Research Center,
Mountain View, Calif., is the NASA technical advisor. Kentucky
Fried Chicken, Louisville, is sponsoring the experiment.

The Effects of Weightlessness on the Healing Bone, SE82-8

This is an experiment proposed by Andrew I. Fras, formerly
of Binghamton High School, N.Y., to establish whether the
environmental effects of spaceflight inhibit bone healing. Fras
is now attending Brown University's Medical School.

Observations of rats from previous space flights, as well as
non-weight bearing bone studies in gravity using rats, have shown
that minerals, calcium in particular, are lost from the body,
resulting in a condition similar to osteoporosis. Calcium is the
main mineral needed in bone formation. This experiment will fly
four Long Evans rats where a minutely small piece of bone will be
removed by a veterinarian from a non-weight bearing bone. The
effects of weightlessness on the origin, development and
differentiation of the osteoblasts (bone cells) and their
production of callus will be studied. A matched control group
will be Earth-based.

Fras, working with scientists and researchers at Orthopaedic
Hospital and University of Southern California, will attempt to
determine whether bone healing in the rat is impeded by the loss
of calcium and the absence of weight bearing during space
flight.

Andrew Fras is the only student to win the NASA/National
Science Teachers Association's Space Science Student Involvement
Program twice. His first project, "The Effect of Weightlessness
on the Aging of Brain Cells," flew on STS 51-D in 1985.

Fras' student advisor is Howard I. Fisher of Binghamton High
School. Orthopaedic Hospital/University of Southern California,
Los Angeles, is sponsoring the experiment and providing advice,
direction and scientific monitoring; the advisors are Dr. June
Marshall and Dr. Augusto Sarmiento. Dr. Emily Holton, NASA Ames
Research Center, Mountain View, Calif., is serving as the NASA
technical advisor.

IMAX

The IMAX project is a collaboration between NASA and the
Smithsonian Institution's National Air and Space Museum to
document significant space activities using the IMAX film
medium. This system, developed by the IMAX Systems Corp.,
Toronto, Canada, uses specially-designed 70mm film cameras and
projectors to record and display very high definition large-
screen color motion picture images.

IMAX cameras previously have flown on Shuttle missions 41-C,
41-D and 41-G to document crew operations in the payload bay and
the orbiter's middeck and flight deck along with spectacular
views of space and Earth. Film from those missions form the
basis for the IMAX production, "The Dream is Alive." On STS 61-
B, an IMAX camera, mounted in the payload bay, recorded
extravehicular activities in the EASE/ACCESS space construction
demonstrations.

The IMAX camera will be used to gather material on the use
of observations of the Earth from space for a new IMAX film to
succeed "The Dream is Alive."

AIR FORCE MAUI OPTICAL SITE CALIBRATION TEST

The Air Force Maui Optical Site (AMOS) tests allow ground-
based electro-optical sensors located on Mt. Haleakala, Maui,
Hawaii, to collect imagery and signature data of the orbiter
during cooperative overflights.

The scientific observations made of the orbiter, while
performing reaction control system thruster firings, water dumps
or payload bay light activation, are used to support the
calibration of the AMOS sensors and the validation of spacecraft
contamination models. The AMOS tests have no payload unique
flight hardware and only require that the orbiter be in
predefined attitude operations and lighting conditions.

The AMOS facility was developed by Air Force Systems Command
(AFSC) through its Rome Air Development Center, Griffiss Air
Force Base, N.Y., and is administered and operated by the AVCO
Everett Research Laboratory in Maui. The principal investigator
for the AMOS tests on the Space Shuttle is from AFSC's Air Force
Geophysics Laboratory, Hanscom Air Force Base, Mass. A co-
principal investigator is from AVCO.

Flight planning and mission support activities for the AMOS
test opportunities are provided by a detachment of AFSC's Space
Division at Johnson Space Center, Houston. Flight operations are
conducted at JSC Mission Control Center in coordination with the
AMOS facilities located in Hawaii.

ORBITER EXPERIMENTS AUTONOMOUS SUPPORTING INSTRUMENTATION

Special instrumentation to record the environment
experienced by Discovery during the STS-29 mission is mounted in
the orbiter payload bay.

Called OASIS, the instrumentation is designed to collect and
record a variety of environmental measurements during various in-
flight phases of the orbiter. The primary device is a large tape
recorder mounted on the aft port side of the orbiter. The OASIS
recorder can be commanded from the ground to store information at
a low, medium or high data rate. After Discovery's mission is
over, the tapes will be removed for analysis.

The information will be used to study the effects on the
orbiter of temperature, pressure, vibration, sound, acceleration,
stress and strain. It also will be used to assist in the design
of future payloads and upper stages.

OASIS is about desk-top size, approximately 4 feet in
length, 1 foot in width, 3 feet in depth and weighs 230 pounds.

The OASIS data is collected from 101 sensors mounted along
the sills on either side of the payload bay, on the airborne
support equipment of the Inertial IUS and on the tape recorder
itself. These sensors are connected to accelerometers, strain
gauges, microphones, pressure gauges and various thermal devices
on the orbiter.

OASIS was launched aboard Discovery on STS-26 in September
1988. Upon return to KSC, the OASIS recorder was removed from
the payload bay and the tape analyzed. Use of this data improved
efficiency in turnaround of the IUS airborne support equipment
for Discovery's STS-29 mission. As more OASIS data is collected,
it will be increasingly beneficial for future IUS flights on the
Space Shuttle.

On STS-29 launch day, the system will be turned on 9 minutes
before Discovery's liftoff to begin recording at high speed to
recover high fidelity data. Following the first burn of the
orbital maneuvering system, the recorder will be switched to the
low data rate and will be commanded again to high speed for
subsequent OMS burns.

Different data rates are to be commanded from the ground at
various times during the on-orbit operations. If tape remains,
the recorder will operate during descent.

NASA is flying OASIS aboard Discovery in support of the IUS
program office of the Air Force Space Division. The system was
developed by Lockheed Engineering and Management Services Company
under a NASA contract. Development was sponsored by the Air
Force Space Division.

STS-29 PAYLOAD AND VEHICLE WEIGHTS

VEHICLE/PAYLOAD WEIGHT (Pounds)

Discovery Orbiter (Empty) 176,019

TDRS-D/IUS 43,212

OASIS I 223
CHROMEX 92
IMAX 276
IUS Support Equipment 204
PCG 81
SHARE 637
SSIP (2) 128

Orbiter and Cargo at SRB Ignition 263,289

Total Vehicle at SRB Ignition 4,525,139

Orbiter Landing Weight 194,616

SPACEFLIGHT TRACKING AND DATA NETWORK

Although primary communications for most activities on STS-
29 will be conducted through the orbiting Tracking and Data Relay
Satellites (TDRS-1 and TDRS-3), NASA Spaceflight Tracking and
Data Relay Network (STDN)-controlled ground stations will play a
key role in several mission activities. In addition, the
stations, along with the NASA Communications Network (NASCOM), at
Goddard Space Flight Center, Greenbelt, Md., will serve as
backups for communications with Space Shuttle Discovery should a
problem develop in the satellite communications.

Three of the 14 stations serve as the primary communications
focal point during the launch and ascent phase of the Shuttle
launch from Kennedy Space Center, Fla. They are Merritt Island
and Ponce de Leon in Florida and Bermuda downrange from the
launch site. For the first minute and 20 seconds, all voice,
telemetry and other communications from the Shuttle are relayed
to the mission managers at Kennedy and at Johnson Space Center,
Houston, by way of the Merritt Island facility.

At 1 minute, 20 seconds, the communications are picked up
from the Shuttle and relayed to KSC and JSC from the Ponce de
Leon facility, 30 miles north of the launch pad. This facility
provides the communications for 70 seconds, or during a critical
period when exhaust energy from the solid rocket motors "blocks
out" the Merritt Island antennas.

The Merritt Island facility resumes communications to and
from the Shuttle after those 70 seconds and maintains them until
6 minutes, 30 seconds after launch when communications are
"switched over" to Bermuda. Bermuda then provides the
communications until 8 minutes, 45 seconds after liftoff when the
TDRS-1 (East) satellite acquires the Shuttle.

Another critical point in the mission is deployment of TDRS-
D from the orbiter. Ground stations at Canberra, Australia;
Goldstone, Calif.; Hawaii; and Guam provide the communications
for the crucial time the satellite is being transferred to
geosynchronous orbit, 22,300 miles above Earth.

Another time the ground stations will play a key role is
during the landing. The facilities at the Ames-Dryden Flight
Research Facility and the Goldstone Deep Space Network stations
provide primary communications for the Shuttle during its
approach and landing at nearby Edwards Air Force Base.

More than 1,500 persons will maintain the stations on a 24-
hour basis during the 5-day mission. In addition to the 14
ground stations, there are six major computing interfaces located
at the Network Control Center and the Flight Dynamics Facility,
both at Goddard; Western Space and Missile Center, Vandenberg
AFB, Calif.; Air Force Satellite Control Facility, Colorado
Springs; White Sands Missile Range, N.M.; and the Eastern Space
and Missile Center, Fla.

The Merritt Island station provides the data to KSC and JSC
during pre-launch testing and the terminal countdown. In
addition to Merritt Island, Ponce de Leon and Bermuda, which
provide S-band communications during launch and ascent, C-band
facilities at Bermuda; Antigua; Cape Canaveral Air Force Station
and Patrick Air Force Base, both in Florida; and Wallops Flight
Facility, Va., provide tracking data, both high and low speed, to
KSC and JSC.

S-band systems carry radio frequency transmissions of
command and telemetry. C-band stations provide radar (skin)
tracking for orbit determination. Ultra high frequency
air/ground (UHF A/G) stations provide astronaut voice
communications with the ground.

NASA plans to close some of its stations as the satellite
tracking system becomes more operational. Stations at Santiago,
Chile, and Guam are expected to cease operations on June 30, and
Hawaii and Ascension will stop operations Sept. 30, 1989.

Currently, Yarragadee, Australia, is part of NASA's laser
network and will be available for use in an emergency during NASA
missions as a backup to TDRS-West (TDRS-3).

Closing of the stations is expected to provide savings of
approximately $30 million a year.

MCC REAL TIME DATA SYSTEM (RTDS)

The real time data system is an intelligent, real-time
assistant to the flight controllers in the Mission Control
Center, Johnson Space Center, during a Shuttle mission. Flight
controller expertise is represented in the form of algorithms and
expert systems. The expert systems monitor performance of
various Shuttle systems. RTDS runs on MASSCOMP mini-computers
which have multiple processors.

During a mission, the expert systems process Shuttle
downlink data and display the results to flight controllers.
Information is presented to the flight controllers through
familiar graphs and schematics, indicating anomalies through
color highlights, text messages and tones. RTDS is significant
because much of the monitoring work traditionally done by the
flight controller and other staff can now be off-loaded to the
expert system, leaving the flight controller free to perform
other tasks.

RTDS was used during STS-26 to aid flight controllers in
monitoring Shuttle main engine performance during the critical
ascent phase and the deployment of the Tracking and Data Relay
Satellite. Based on the success of RTDS during the STS-26
mission, the system has been expanded and incorporated into other
Shuttle flight control disciplines.

During STS-29, RTDS will be used to aid the integrated
communications officer, booster, mechanical, manipulator and crew
systems flight controllers. RTDS displays have been installed
into and around the consoles of these three flight control
disciplines, providing the information to perform certain flight
control tasks. Additionally, the electronic analog of certain
cockpit instruments, such as the attitude and direction
indicator, are being modeled on the RTDS displays to give flight
control personnel an understanding of the information available
to the astronauts flying in the Shuttle.

RTDS represents the first operational use of real-time
expert system technologies for manned spacecraft monitoring and
as such, has provided a hands-on understanding of these
technologies. The system will be expanded on future flights to
include additional controller functions.

CREW BIOGRAPHIES

MICHAEL L. COATS, 43, captain, USN, is mission commander.
Born in Sacramento, Calif., he considers Riverside, Calif., his
hometown. Coats is a member of the astronaut class of 1978.

Coats was pilot of the 14th Space Shuttle mission (41- D)
launched Aug. 30, 1984 marking orbiter Discovery's maiden
flight. The 41-D crew earned the nickname "Icebusters" because
of their successful removal of hazardous ice particles from the
orbiter using the remote manipulator system. The flight included
several "firsts:" The first time three communications satellites
were deployed during one mission; the first "frisbee" satellite
deployment; and the first time a commercial payload specialist
flew aboard the Shuttle.

Coats has logged more than 144 hours in space. He earned a
B.S. degree from the United States Naval Academy in 1968, a M.S.
degree in administration of science and technology from George
Washington University in 1977, and a M.S. in aeronautical
engineering from the U.S. Naval Postgraduate School in 1979.

Coats became a naval aviator in September 1969 and served 25
months as an A-7E pilot aboard the USS Kittyhawk. During that
time, he flew 315 combat missions in Southeast Asia. Coats, in
1974, attended test pilot training. Following his training, he
was project officer and the test pilot for the A-7 and A-4
aircraft at the Strike Aircraft Test Directorate and served as a
flight instructor at the U.S. Naval Test Pilot School from April
1976 to May 1977. He has logged more than 4,700 hours flying
time and 400 carrier landings in 22 different types of aircraft.

JOHN E. BLAHA, 46, colonel, USAF, is pilot. He was born in
San Antonio, Texas. Blaha, making his first flight, is a member
of the astronaut class of 1980.

He has been an ascent, orbit, planning and entry capsule
communicator (CAPCOM) in the Mission Control Center for seven
Shuttle flights. Blaha was lead CAPCOM for the STS 41-D and STS
41-G missions. He served as the astronaut office representative
of the Space Shuttle ascent/abort reassessment team and the
orbital maneuvering system/reaction control system reassessment
group.

Blaha earned a B.S. degree in engineering science from the
U.S. Air Force Academy in 1965 and a M.S. degree in astronautical
engineering from Purdue University in 1966. He received his
pilot wings in 1967. He then served as an operational pilot
flying A-37, F-4, F-102 and F-106 aircraft and completed 361
combat missions in Southeast Asia.

Blaha attended the USAF Aerospace Research Pilot School in
1971 and later served as an instructor pilot at the test pilot
school. He served as a test pilot working with the Royal Air
Force in the United Kingdom for 3 years. Blaha also has worked
for the Assistant Chief of Staff, Studies and Analyses at USAF
Headquarters in the Pentagon. He has logged 4,300 hours of
flying time in 32 different aircraft.

JAMES F. BUCHLI, 43, colonel, USMC, is mission specialist
one (MS-1). Although born in New Rockford, N.D., Buchli
considers Fargo, N.D., his hometown. He is a member of the
astronaut class of 1978.

Buchli was a mission specialist on STS 51-C launched on Jan.
24, 1985. The first Department of Defense mission included
deployment of a modified inertial upper stage from the Space
Shuttle Discovery.

He next flew Oct. 30, 1985 as a mission specialist on STS
61-A, the West German Spacelab D1 mission. That mission was the
first to carry eight crewmembers, the largest crew to fly in
space and the first in which payload activities were controlled
from outside the United States. Buchli has logged a total of 243
hours in space.

He earned a B.S. degree in aeronautical engineering from the
U.S. Naval Academy in 1967 and a M.S. degree in aeronautical
engineering systems from the University of West Florida in 1975.

Following graduation from the U.S. Naval Academy and his
commission in the USMC, Buchli served for 1 year in the Republic
of Vietnam. He then completed naval flight officer training and
was assigned to Marine fighter/attack squadrons in Hawaii, Japan
and Thailand. He has logged 3,500 hours flying time, 3,300 hours
in jet aircraft.

ROBERT C. SPRINGER, 46, colonel, USMC, is mission specialist
two (MS-2). Although born in St. Louis, he considers Ashland,
Ohio, his hometown. Springer is a member of the astronaut class
of 1980 and will be making his first space flight.

He has worked in the Mission Control Center as a CAPCOM for
seven flights and was responsible for Astronaut Office
coordination of design requirements reviews and design
certification reviews, part of the total recertification and
reverification of the National Space Transportation System prior
to STS-26's return to flight.

Springer earned a B.S. degree in naval science from the U.S.
Naval Academy in 1964 and a M.S. in operations research and
systems analysis from the U.S. Naval Postgraduate School in 1971.

After receiving a USMC commission, Springer received his
aviator wings in August 1966 and was assigned to VMFA-513 at the
Marine Corps Air Station in Cherry Point, N.C., where he flew F-4
aircraft. He then served in Southeast Asia where he flew F-4s
and completed 300 combat missions. In June 1968, Springer served
as an advisor to the Republic of Korea Marine Corps in Vietnam
and flew 250 combat missions in 01 "Bird Dogs" and UH1 "Huey"
helicopters.

Springer attended Navy Fighter Weapons School (Top Gun) and
in 1975 graduated from the U.S. Navy Test Pilot School in
Patuxent River, Md. He has served as a test pilot for more than
20 different fixed- and rotary-wing aircraft and performed the
first flights in the AHIT helicopter. Springer has logged more
than 3,500 hours flying time, including 3,000 hours in jet
aircraft.

JAMES P. BAGIAN, M.D., 36, is mission specialist three (MS-
3). This will be his first space flight. Born in Philadelphia,
he is a member of the astronaut class of 1980.

Bagian participated in the planning and provision of
emergency medical and rescue support for the first six Shuttle
flights and has participated in the verification of Space Shuttle
flight software. In 1986, Bagian became an investigator for the
51-L accident board and has been responsible for the development
of the pressure suit and other crew survival equipment astronauts
now use on Shuttle missions.

He earned a B.S. degree in mechanical engineering from
Drexel University in 1973 and a doctorate in medicine from Thomas
Jefferson University in 1977.

Bagian worked as a process engineer for the 3M Company in
1973 and later as a mechanical engineer at the U.S. Naval Air
Test Center at Patuxent River, Md. He worked as a flight surgeon
and research medical officer at the Johnson Space Center in 1978
while completing his studies at the USAF Flight Surgeons School
and USAF School of Aerospace Medicine in San Antonio, Texas. An
active participant in the mountain rescue community, Bagian has a
private pilot's license and has logged more than 1,000 hours
flying time in propeller and jet aircraft, helicopters and
gliders.

SPACE SHUTTLE PROGRAM MANAGEMENT

NASA HEADQUARTERS

Dr. James C. Fletcher Administrator

Dale D. Myers Deputy Administrator

RADM Richard H. Truly Associate Administrator
for Space Flight

George W. S. Abbey Deputy Associate Administrator
for Space Flight

Arnold D. Aldrich Director, National Space
Transportation Program

Richard H. Kohrs Deputy Director, NSTS Program
(located at Johnson Space Center

Robert L. Crippen Deputy Director, NSTS Operations
(located at Kennedy Space Center)

David L. Winterhalter Director, Systems Engineering
and Analyses

Gary E. Krier Acting Director, Operations
Utilization

Joseph B. Mahon Deputy Associate Administrator
for Space Flight (Flight Systems)

Charles R. Gunn Director, Unmanned Launch
Vehicles and Upper Stages

George A. Rodney Associate Administrator for Safety,
Reliability, Maintainability and
Quality Assurance

Robert O. Aller Associate Administrator for
Operations

Eugene Ferrick Director, Space Network Division

Robert M. Hornstein Director, Ground Network Division

JOHNSON SPACE CENTER

Aaron Cohen Director

Paul J. Weitz Deputy Director

Richard A. Colonna Manager, Orbiter and GFE Projects

Donald R. Puddy Director, Flight Crew Operations

Eugene F. Kranz Director, Mission Operations

Henry O. Pohl Director, Engineering

Charles S. Harlan Director, Safety, Reliability
and Quality Assurance

KENNEDY SPACE CENTER

Forrest S. McCartney Director

Thomas E. Utsman Deputy Director; Director, Shuttle
Management and Operations

Robert B. Sieck Launch Director

George T. Sasseen Shuttle Engineering Director

John J. Talone STS-29 Flow Director

James A. Thomas Director, Safety, Reliability
and Quality Assurance

John T. Conway Director, Payload Management
and Operations

MARSHALL SPACE FLIGHT CENTER

James R. Thompson Jr. Director

Thomas J. Lee Deputy Director

William R. Marshall Manager, Shuttle Projects Office

Dr. J. Wayne Littles Director, Science and Engineering

Alexander A. McCool Director, Safety, Reliability
and Quality Assurance

Gerald W. Smith Manager, Solid Rocket Booster Project

Joseph A. Lombardo Manager, Space Shuttle Main
Engine Project

Jerry W. Smelser Acting Manager, External Tank Project

AMES RESEARCH CENTER

Dr. Dale L. Compton Acting Director

Victor L. Peterson Acting Deputy Director

AMES-DRYDEN FLIGHT RESEARCH FACILITY

Martin A. Knutson Site Manager

Theodore G. Ayers Deputy Site Manager

Thomas C. McMurtry Chief, Research Aircraft
Operations Division

Larry C. Barnett Chief, Shuttle Support Office

GODDARD SPACE FLIGHT CENTER

Dr. John W. Townsend Director

Gerald W. Longanecker Director, Flight Projects

Robert E. Spearing Director, Operations and Data Systems

Daniel A. Spintman Chief, Networks Division

Vaughn E. Turner Chief, Communications Division

Dr. Dale W. Harris TDRS Project Manager

Charles M. Hunter TDRS Deputy Project Manager

Gary A. Morse Network Director

 
To the best of our knowledge, the text on this page may be freely reproduced and distributed.
If you have any questions about this, please check out our Copyright Policy.

 

totse.com certificate signatures
 
 
About | Advertise | Bad Ideas | Community | Contact Us | Copyright Policy | Drugs | Ego | Erotica
FAQ | Fringe | Link to totse.com | Search | Society | Submissions | Technology
Hot Topics
here is a fun question to think about...
Miscibility
Possible proof that we came from apes.
speed of light problem
Absolute Zero: Why won't it work?
Why did love evolve?
Capacitators
Intersection of two quads
 
Sponsored Links
 
Ads presented by the
AdBrite Ad Network

 

 

TSHIRT HELL T-SHIRTS